AeroWorks Extra 260 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Jouets et accessoires AeroWorks Extra 260. 50 Extra 260.pub Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - 60-90 EXTRA 260 ARF-QB

1 60-90 EXTRA 260 ARF-QB (Quick Build) ASSEMBLY MANUAL AEROWORKS 4903 Nome Street, Denver, CO. 80239 - Phone 303-371-4222 - Fax 303-371-4320 E

Page 2 - TABLE OF CONTENTS

10 Aileron/Servo Installation The ailerons and wings come pre-hinged but are not glued. The builder must glue the hinges in place using thin CA. 1.

Page 3 - !WARNING!

11 5. Using preinstalled draw string draw the servo extension through the wing and pull through the wing root rib. Note: Taping servo lead to the

Page 4

12 2. Place the control horns over the predrilled mounting holes. 3. Use a Phillips screw driver to install the 2 con-trol horn mounting bolts.

Page 5 - KIT CONTENTS

13 6. Locate the 2 aileron pushrods, 2 metal R/C links and 2 nylon keepers. 7. Use tape to keep the aileron centered during the pushrod installat

Page 6 - SUB ASSEMBLIES:

14 10. Final servo installation shown below. Be sure to use a piece of fuel tubing over the clevis to keep it secure. Stab/Elevator Installation 1

Page 7 - ITEMS NEEDED TO COMPLETE

15 4. Use a pen to lightly mark the stabs position in relation to the fuse on both top and bottom. 5. Remove stab and insert elevator into fuse.

Page 8

16 8. Install the elevator hinges into the stab and re-move the pins. Use thin CA to glue the hinges in place. Servo and Pushrod Installation 1

Page 9 - IMPORTANT:

17 4. Install the servo using the hardware supplied by the servo manufacturer. 5. Install the nylon control horn using the same method as descr

Page 10 - WING ASSEMBLY

18 2. Use 3-4 drops of Thin CA on each side of the rudder to securely glue each hinge to the Verti-cal fin. 3. Gather the pull pull hardware,2 0

Page 11

19 6. Place a drop of Thick CA on the nuts to prevent them from loosening in flight. 7. Install the rudder servo with the output shaft fac-ing to

Page 12

2 TABLE OF CONTENTS Page Aeroworks Contact Information ………………………………………………………………. 3 Introduction ……………………………………………………………………………………

Page 13

20 10. Pull the rudder cables from rear of fuse to the rudder servo tray. Note: Cables run parallel down fuse and do not cross each other. 11

Page 14 - Stab/Elevator Installation

21 14. Assemble and install the clevises onto the rudder control horns. Finished pull-pull assembly shown below. MAIN LANDING GEAR/ TAIL WHEEL/

Page 15

22 3. Install the rear wheel collar about 2mm away from the axle back plate, install the wheel and then install the final collar. Hint: Use a sm

Page 16

23 7. Main landing gear installation is now complete. 8. Align rudder tiller steering arm with pre drilled mounting holes at bottom of rudder. 9.

Page 17

24 11. Install the tail wheel using three wood screws. Use thick CA to secure the mounting screws. 12. Attach the rudder steering springs to

Page 18

25 2. Gather the glow engine of your choice, 8 6-32 bolts 8 3.5mm flat washers, 4 3.5mm split lock washers and 4 6-32 lock nuts. Note: An OS .61 F

Page 19

26 6. Mark the position of the engine mounting holes on the engine mount. Mark the center of each engine mounting hole with a center marking tool or

Page 20

27 10. Trace the size and location of the throttle push-rod guide tube onto the firewall. Note: Insure throttle pushrod is lined up with thrott

Page 21 - ASSEMBLY

28 Throttle servo installation for 2 stroke engine 1. Gather the throttle servo, two plywood pushrod guides, two nylon clevises with threaded inse

Page 22

29 5. Install the precut foam block at the rear of the firewall. Glue or double sided tape may be used to secure the foam block to the tank floor.

Page 23

3 4903 Nome Street Denver, CO 80239 Phone: (303) 371-4222 Fax: (303) 371-4320 Website: www.aero-works.net E-mail: [email protected] Thank y

Page 24 - ENGINE INSTALLATION

30 2. Install the engine using the same method as the 2 stroke installation. The correct distance from the firewall to the thrust washer is 4 3/4”.

Page 25 - 2 STROKE ENGINE INSTALLA

31 6. Install the pushrod guide tube and throttle push-rod onto the engine using the pre-bent Z-bend. 7. Attach the pushrod to the servo using the

Page 26

32 10. Route the included zip ties through the precut tank mounting slots. 11. Place the 6mm x 130mm x 60mm foam pad onto the tank floor.

Page 27

33 1. Gather the fuel tank parts as shown below. Fuel tank, hardware, and fuel tubing. Hint: We have supplied two colors of fuel line . This

Page 28

34 5. Install the fuel filler dot (not supplied) higher than the tank to keep the fuel from draining out during refueling. 6. Install the fuel t

Page 29

35 1. Use a sharp X-Acto knife to remove the cov-ering from the hot air exits. Note: Use a covering iron to seal the cover- ing before removin

Page 30

36 5. The following electric motor installation will use the skyshark lightning 50 power package elec-tric package available through Aeroworks, oth

Page 31

37 10. Measure and mark the center of the motor mounting block. Center mark all four sides that will mount to the firewall. 11. Align the center ma

Page 32

38 13. Drill the 4 mounting holes using a 5-32 drill bit. 14. Clamp the mounting block to the firewall and use a pencil to mark the location of the

Page 33

39 17. Gather the 2 supplied air inlets. Use 200 grit sand paper to lightly scuff the gluing surface for a stronger bond. 18. Use 30 minute epoxy t

Page 34

4 INTRODUCTION Your new 60-90 EXTRA 260 ARF-QB is a highly aerobatic airplane. It is capable of both precision and 3-D maneuvers. The aircraft bui

Page 35

40 21. Check the distance from the firewall to the prop adaptor, the correct distance is 4 3/4”. 22. Install the ESC in an area that will provide ad

Page 36

41 25. Final electric installation shown below.

Page 37

42 1. Gather the materials as shown below. Template material, hobby knife, ruler, tape, marker and pencil. Cowl Installation 3. Flip the airplane

Page 38

43 5. Use a Dremel tool to cut out the cowl. 7. Cut a strip of the template long enough to reach the glow plug on the engine. Tape this strip t

Page 39

44 10. Finished cowl installation shown below.

Page 40

45 1. Gather the receiver, receiver battery, switch, 6” extension 2 nylon ties, foam pad, and Velcro One Wrap Strap as shown below. Radio Installat

Page 41

46 6. Mount the receiver battery with nylon tie and foam padding. 7. Mount the receiver using foam pad and a Velcro One wrap Strap. 8. Inst

Page 42 - Cowl Installation

47 1. Decals supplied with the kit may vary from the photos below. Decal installation instructions are for reference purposes only. Gather suppl

Page 43

48 3. Use a straight edge and a hobby knife to separate the decals from the rest of the decal sheet. 4. Cut a strip of transfer tape the same siz

Page 44

49 7. Firmly press the transfer tape onto the decal. 8. Peel the backing away from the decal. 9. Spray the area with application fluid before

Page 45 - Radio Installation

5 KIT CONTENTS MATERIAL LIST 60-90 size Extra 260 BASIC AIRCRAFT PARTS: Fuselage with pre-installed vertical fin – covered, fire-wall fuel-proofe

Page 46

50 11. Using a plastic squeegee or credit card. Spread decal smooth and remove all excess application fluid. Let decal set until dry enough to be abl

Page 47 - Decal installation

51 1. Slide the wing tube in the fuse wing tube sleeve. Slide the wings on the wing tube and plug in the aileron servo connectors. Slide the rubbe

Page 48

52 Center of Gravity (C.G.) 2 1/4” Back from the wing Leading Edge measured at the wing tip Warning Do not skip this step! CENTER OF GRAVIT

Page 49

53 3. Use the widest part of the elevator as shown to measure the elevator throw in inches. 4. Gather the Rudder Throw Meter (Supplied) and scotch

Page 50

54 7. Use a flight control deflection meter to measure the throws in degrees. Prop up the tail of the aircraft until the fuselage is parallel to th

Page 51 - PRE-FLIGHT PREPARATION

55 Preflight Checks Center of Gravity: Check CG is set properly. Engine: The engine should run smoothly at all throttle settings with smooth tra

Page 52 - 2 1/4”

56 60-90 EXTRA 260 ARF-QB NOTES ___________________________________________________________________________ ___________________________________

Page 53

6 Horizontal Stabilizer with elevator assembly with (6) CA hinges (not glued)---covered Elevators Pre-drilled for the mounting of the control horns

Page 54 - Aeroworks

7 Hardware: ITEMS NEEDED TO COMPLETE • .60-90 Glow engine • Standard or Pitts style Muffler • 2 x aileron servos (min 80 in./oz. Torque @ 4.8 vol

Page 55 - AEROWORKS

8 1. Open your kit slowly and take care not to dam-age any parts of the kit. Remove all parts from their plastic protective covers for inspection.

Page 56 - 60-90 EXTRA 260 ARF-QB NOTES

9 1. Go over all seams and color overlaps with your sealing iron. Note: Even if your models covering has no wrin-kles out of the box it is still

Commentaires sur ces manuels

Pas de commentaire